Mechanical mechanism analysis of rockburst in deep-buried tunnel with high in-situ stress
The Qinling water conveyance tunnel has a large buried depth and high in-situ stress level, and rockburst disasters frequently occurred during excavation. In order to find out the mechanical mechanism of rockburst, the research work in this paper is as follows: (1) In-situ three-dimensional hydrauli...
Gespeichert in:
Veröffentlicht in: | Scientific reports 2024-08, Vol.14 (1), p.18076-16, Article 18076 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The Qinling water conveyance tunnel has a large buried depth and high in-situ stress level, and rockburst disasters frequently occurred during excavation. In order to find out the mechanical mechanism of rockburst, the research work in this paper is as follows: (1) In-situ three-dimensional hydraulic fracturing method was used to measure the in-situ stress of the deep buried tunnel crossing the ridge. (2) Based on the measured in-situ stress results, the stress distribution characteristics of the tunnel crossing the ridge were obtained by the multiple linear regression method, and the rockburst tendency during construction was predicted. (3) A three-dimensional numerical model of tunnel excavation was established to analyze the dynamic adjustment characteristics of the surrounding rock stress and elastic strain energy during TBM excavation, and to clarify the mechanical mechanism of rockburst. The research results show that the maximum principal stress of the deep-buried tunnel crossing the ridge of Qinling is 40–66 MPa, which belongs to extremely high in-situ stress level, and medium-strong rockburst may occur during excavation. In the process of TBM excavation, the stress of the surrounding rock in the range of 2.6 times the diameter of the tunnel before and after the working face is adjusted violently, and the concentrated zones after the stress redistribution are mainly distributed in the arch roof and arch bottom, and the stress concentration coefficient can reach 2.06. The arch roof, arch waist, and arch bottom are susceptible to immediate rockburst due to stress transient unloading at the moment of excavation. After the elastic strain energy of the surrounding rock at the arch roof and the arch bottom is released and accumulated, it is easy to cause time delayed rockburst, and the depth of the rockburst pit can reach 3.5 m, which is consistent with the rockburst phenomenon in the field. |
---|---|
ISSN: | 2045-2322 2045-2322 |
DOI: | 10.1038/s41598-024-69274-x |