OPEN-PIT TIME SCALE OPTIMISATION IN A TRUCK SCHEDULING PROBLEM
In the present economic situation, the open-pit mining processes require flexible solutions for achieving the set goals. The aim of the study is to consider a comprehensive mathematical model for a short and long term open-pit mine optimisation in a truck scheduling problem. The model can be applied...
Gespeichert in:
Veröffentlicht in: | Sustainable Extraction and Processing of Raw Materials Journal 2020-11, Vol.1 (1), p.11-13 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In the present economic situation, the open-pit mining processes require flexible solutions for achieving the set goals. The aim of the study is to consider a comprehensive mathematical model for a short and long term open-pit mine optimisation in a truck scheduling problem. The model can be applied in different situations with various number of units and trajectories depending on the landscape of the area in question. Significant amount of parameters modulating the discussed processes is analysed. |
---|---|
ISSN: | 2738-7100 2738-7151 |
DOI: | 10.5281/zenodo.4269988 |