Determination and monitoring of ore recovery and dilution coefficients in Sasa lead and zinc mine - M. Kamenica, R. Macedonia
In this paper, proceeding of determination and monitoring of ore recovery and dilution coefficients in lead and zinc mine 'Sasa' - M. Kamenica, will be presented. The calculation of these technical and economic excavation parameters were carried out by means of geodetic evaluations and mea...
Gespeichert in:
Veröffentlicht in: | Podzemni radovi 2015, Vol.2015 (26), p.1-8 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, proceeding of determination and monitoring of ore recovery and dilution coefficients in lead and zinc mine 'Sasa' - M. Kamenica, will be presented. The calculation of these technical and economic excavation parameters were carried out by means of geodetic evaluations and measurements of the volume of excavated and non excavated ore for each stope in the pit. |
---|---|
ISSN: | 0354-2904 |
DOI: | 10.5937/podrad1526001M |