Information models of tactical and operational planning levels in energy construction
The strategic, tactical and operational levels of energy construction planning are considered. The purpose of the article is to present information models for solving multi-criteria tasks of forming schedules of various types. For the first information model based on vector representations of aggreg...
Gespeichert in:
Veröffentlicht in: | E3S web of conferences 2024, Vol.525, p.5005 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The strategic, tactical and operational levels of energy construction planning are considered. The purpose of the article is to present information models for solving multi-criteria tasks of forming schedules of various types. For the first information model based on vector representations of aggregations, a multilevel classification of criteria and ranking algorithms for multi-criteria tasks is proposed. A structural analysis of criteria and ranking algorithms for multi-criteria tasks is carried out. Schemes of hierarchies of multiple inclusion of criteria and ranking algorithms for information planning models are presented. Recursive definitions of criteria and ranking algorithms are obtained. For the second information model, a heuristic paradigm of centralized scheduling is described for various types of presentation of source data, namely: sets of independent applications, sets of application vectors and sets of hierarchical or network structures of applications. The scheduling paradigm is based on the use of two schemes for generating schedules and priority rules. Using the first constructive scheme, the initial schedule is cyclically formed. |
---|---|
ISSN: | 2267-1242 2267-1242 |
DOI: | 10.1051/e3sconf/202452505005 |