Causes of delay and cost overrun for educational building projects in Egypt

The construction industry is considered one of the most important industries in Egypt. the majority of construction projects are known to have time delays and cost overruns. the main contribution of this study is that it is the first study of its type that identifies causes of delay and cost overrun...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:JES. Journal of Engineering Sciences 2021-09, Vol.49 (5), p.577-596
Hauptverfasser: Faraj, Mutazz Awad, Muhammad, Ala A., Jibril, Muhammad, Assaf, Kamal Abbas
Format: Artikel
Sprache:ara ; eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The construction industry is considered one of the most important industries in Egypt. the majority of construction projects are known to have time delays and cost overruns. the main contribution of this study is that it is the first study of its type that identifies causes of delay and cost overrun in educational building projects with its different types (public schools, private schools, public universities, and private universities) within Egypt. the research main objective is to identify the causes of delay and cost overrun in educational building projects in Egypt and evaluate their importance by the main project stakeholders (consultants, contractors, and owners). this objective was accomplished by means of an extensive literature review and a questionnaire-based survey. forty causes of delay and cost overrun were gathered through the literature review and categorized into seven groups. the questionnaire was divided into three sections; the main section concentrated on the causes of delay and cost overrun in construction projects. responses were gathered from 130 participants representing the key stakeholders participated in the project's construction. the analysis was conducted to determine the amount of delay and cost overrun experienced by the projects, in addition to the indices concerning the frequency of occurrence, impact on time and cost, and significance of the seven groups. as well, a ranking of the forty causes was performed to identify the most critical causes of delay and cost overrun in each type of educational building projects (public schools, private schools, public universities, and private universities). concluded that the most common causes of delay and cost overrun between all types are: price instability, price escalation of material, delays in contractor’s progress payment, financial problems, and contractor’s difficulties in financing the project. تعتبر صناعة البناء من أهم الصناعات في مصر من المعروف أن معظم مشروعات البناء معرضة لتأخير الوقت وتجاوز التكاليف المساهمة الرئيسية لهذه الدراسة أنها الدراسة الأولى من نوعها التي تحدد أسباب التأخير وتجاوز التكلفة في مشاريع الأبنية التعليمية بأنواعها المختلفة المدارس الحكومية والمدارس الخاصة والجامعات الحكومية والجامعات الخاصة داخل مصر. الهدف الرئيسي من هذه الدراسة هو التعرف على أهم أسباب التأخير وتجاوز التكلفة في مشروعات الأبنية التعليمية في مصر وتقييم أهميتها من قبل أصحاب المصلحة الرئيسيين في المشروع المستشارون والمقاولون والملاك. تم تحقيق هذا الهدف من خلال مراجعة الدراسات السابقة ومسح
ISSN:1687-0530
2356-8550
2356-8550
DOI:10.21608/jesaun.2021.69258.1044