Power System Reliability Evaluation Based on Chronological Booth–Baleriaux Method

The complexity of modern power systems is increasing because of the development of various intermittent generators. In practical reliability evaluations, it is essential to include both the failure of conventional generators and the output characteristics of renewable energy; the use of the latter h...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied sciences 2023-07, Vol.13 (14), p.8548
Hauptverfasser: Oh, Hyobin, Shin, Hansol, Kwag, Kyuhyeong, Hwang, Pyeongik, Kim, Wook
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The complexity of modern power systems is increasing because of the development of various intermittent generators. In practical reliability evaluations, it is essential to include both the failure of conventional generators and the output characteristics of renewable energy; the use of the latter has increased rapidly. The weather-dependent nature of renewable energy output, which is inexplicable in the load duration curve method, highlights the need for further study of the methods of a reliability evaluation that can consider temporal characteristics. This paper proposes a deterministic reliability evaluation method based on the Booth–Baleriaux method, chronologically extended to address the preventative maintenance schedule of a generator and the characteristics of renewable energy. The proposed method was applied to an IEEE reliability test system for performance verification, and a reliability evaluation was performed considering various chronological patterns. The proposed method was also applied to determine the adequate capacity reserve that should be installed in a Korean power system. The proposed method is stable, and it produced robust results.
ISSN:2076-3417
2076-3417
DOI:10.3390/app13148548