Selection of methods used for analyzing the standard time needed to complete the assembly process by means of a fuzzy analytic hierarchy process

This paper is a review of four main methods of analyzing the standard time needed to complete a given job: chronometric analysis, working-day activity study (working-day photo), work sampling observations, and analysis of basic motions. Thanks to the application of FAHP (Fuzzy Analytic Hierarchy Pro...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Cieślak, Robert, Suszyński, Marcin
Format: Tagungsbericht
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This paper is a review of four main methods of analyzing the standard time needed to complete a given job: chronometric analysis, working-day activity study (working-day photo), work sampling observations, and analysis of basic motions. Thanks to the application of FAHP (Fuzzy Analytic Hierarchy Process) method, the values of weighted coefficients were obtained which describe the importance of selecting the criteria of the choice of methods used to analyze the standard time in the assembly process. In the summary paragraph of this paper, the results of analyzing the criteria are discussed.
ISSN:2261-236X
2274-7214
2261-236X
DOI:10.1051/matecconf/201713701014