Visual inspection results and evaluation of Akhtala tailing safety based on tailing management facility safety methodology
Relevance. Mining sector is one of the leading branches of the industry in Armenia. Therefore, effective government regulation of the sector based on a sound legal basis is a necessity. Accidents at tailing management facilities are posing a high risk to people and environment especially in their ne...
Gespeichert in:
Veröffentlicht in: | Izvestiâ Tomskogo politehničeskogo universiteta. Inžiniring georesursov 2024-02, Vol.335 (2), p.60-68 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Relevance. Mining sector is one of the leading branches of the industry in Armenia. Therefore, effective government regulation of the sector based on a sound legal basis is a necessity. Accidents at tailing management facilities are posing a high risk to people and environment especially in their near vicinity and often have a transboundary impact. The tailing management facility safety methodology elaborated under the auspices of the German Environmental Agency is an efficient tool for quick assessment of the technical condition of the tailing management facilities. Aim. To present the results of application of the tailing management facility methodology in Armenia, which was applied to the operated Nahatak tailing management facility of the Akhtala Ore Dressing Combine (Lori region, Armenia). Objects. Tailing management facility methodology was applied to the operated tailing management facility Nahatak of the Akhtala Ore Dressing Combine, for which all documentation was checked. Enrichment wastes were stored at the tailing management facility during processing copper ore from the Shamlug mine and polymetals from the Akhtala mine. The main visual inspection was carried out in three parts of the tailing management facility: main dam, drainage canal and secondary dam. Special attention was drawn to main dam conditions. The video recorded by a drone was used to explore the dam bottom-line. Methods. The tailing management facility methodology includes the following elements: the method of evaluation of Tailings Hazard Index; the tailing management facility checklists including the questionnaire for visual and documentation inspection, the evaluation matrix for the tailing management facility safety level; the measures catalogue for taking actions to improve tailing management facility safety. The questions of the each tailing management facility checklist are stated in a way to encompass the minimum set of the requirements, critical for tailing management facility safety, which allows evaluating the tailing management facility conditions. Questions in all groups of the checklist are sorted by the tailing management facility lifecycle and each subsection contains relevant questions applied to a specific stage (design, construction, operation, re-cultivation, closure). Application of the tailing management facility checklist is supported by a measures catalogue with short-, medium- and long-term safety measures. Results. The tailing management facility method |
---|---|
ISSN: | 2500-1019 2413-1830 |
DOI: | 10.18799/24131830/2024/2/4034 |