Comparative optimization of mining the Kraku Bugaresku Cementation deposit using Whittle and NPV Scheduler software

The paper is aimed to present a method of determining the final pit contour with maximum discounted profit, to determine the stages of excavation (Pushbacks) and mining schedule for the final pit using the software packages for strategic planning of open pit mining - Whittle and NPV Scheduler, in th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Mining and Metallurgy Engineering Bor (Online) 2014-01, Vol.2014 (2), p.61-80
Hauptverfasser: Kostić Vedran, Vaduvesković Zoran
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The paper is aimed to present a method of determining the final pit contour with maximum discounted profit, to determine the stages of excavation (Pushbacks) and mining schedule for the final pit using the software packages for strategic planning of open pit mining - Whittle and NPV Scheduler, in the case of optimization the Kraku Bugaresku Cementation deposit. In both cases the same techno - economic parameters were used and the same initial topography. The aim or intention of the authors was not to judge or advertise the aforementioned software packages, but to demonstrate the optimization procedure in a specific case, with reference to the basic differences. Comparison of the obtained results is also a verification of correctness of the optimization results.