Study on Field Test of Deformation and Stability Control Technology for Shallow Unsymmetrical Loading Section of Super-Large-Span Tunnel Portal

This study focuses on monitoring the deformation of the shallow unsymmetrical section of a super-large-span tunnel portal relying on the newly built Shimentangshan Tunnel, and through numerical simulations, the construction sequence and drift ratios were optimized to address challenges related to th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied sciences 2024-07, Vol.14 (13), p.5796
Hauptverfasser: Wan, Li, Luo, Yanbin, Zhang, Changan, Tian, Chaopeng, Shao, Xing, Liu, Zhen
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This study focuses on monitoring the deformation of the shallow unsymmetrical section of a super-large-span tunnel portal relying on the newly built Shimentangshan Tunnel, and through numerical simulations, the construction sequence and drift ratios were optimized to address challenges related to the stability of surrounding rock and structure. The findings indicate that employing the double-side drift method results in a maximum settlement value of 107.0 mm and a maximum convergence value of 108.8 mm, leading to larger deformations. Excavating the shallow buried side first followed by the deep buried side proves beneficial for deformation control of the support structure and effectively limits damage to the surrounding rock. A drift ratio of 0.3 ensures optimal support structure security and stability. Considering both structural deformation and surrounding rock damage, a ratio between 0.25 and 0.35 for the drifts is recommended. Taking into account construction efficiency and economic benefits, a construction plan for the shallow buried unsymmetrical section at the portal of super-large-span tunnels is proposed.
ISSN:2076-3417
2076-3417
DOI:10.3390/app14135796