TBM Selection Optimization and Tunneling Parameter Control in Complex Offshore Strata for Urban Rail Transit

[Objective] In order to improve the formation adaptability of the tunnel boring machine (shorten as TBM) and solve the problem of TBM selection for the west extension section of Qingdao Metro Line 2 (hereinafter referred to as Line 2) in the complex formation offshore, it is necessary to optimize TB...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Chengshi Guidao Jiaotong Yanjiu 2024-03, Vol.27 (3), p.43-48
Hauptverfasser: Jian SHI, Weijing LIU, Shilin ZHANG, Suozai LI, Desen KONG
Format: Artikel
Sprache:chi
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:[Objective] In order to improve the formation adaptability of the tunnel boring machine (shorten as TBM) and solve the problem of TBM selection for the west extension section of Qingdao Metro Line 2 (hereinafter referred to as Line 2) in the complex formation offshore, it is necessary to optimize TBM selection and control tunneling parameters. [Method] From the aspects of geological condition adaptability, construction flexibility and excavation efficiency, the TBM types are comprehensively compared and the one suitable for hard rock excavation is selected. In view of the engineering difficulties in the TBM tunneling section of Line 2, such as crossing fracture zone, insufficient starting space, small curvature radius construction and lack of lifting conditions, the TBM is optimized. The range of parameter values including thrust, torque, cutter speed and net tunneling rate of double-shield TBM under different grades of wall rock are determined. [Result & Conclusion] After comprehensive comparison, DSUC type
ISSN:1007-869X
DOI:10.16037/j.1007-869x.2024.03.008