Pressure evaluation of a gap space in the engineered barrier system in a high-level radioactive waste repository
Disposal canisters and buffer materials are main components in an engineered barrier system designed for high-level radioactive waste disposal. The design temperature of the buffer material is below 100 °C in most countries, and many studies have been conducted to increase the design temperature of...
Gespeichert in:
Veröffentlicht in: | Case studies in thermal engineering 2023-10, Vol.50, p.103458, Article 103458 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Disposal canisters and buffer materials are main components in an engineered barrier system designed for high-level radioactive waste disposal. The design temperature of the buffer material is below 100 °C in most countries, and many studies have been conducted to increase the design temperature of the buffer material to increase the disposal density of the repository. A 1-cm air gap exists between the canister and buffer material that can cause several variations in the thermal–hydraulic–mechanical performance of the compacted bentonite buffer material. Therefore, considering the air-gap effect under high-temperature conditions is necessary because high temperatures can cause pressure variations in the air gap and compacted bentonites. Therefore, an experimental system was developed to measure the pressure variations in a confined cell, which contained air and compacted bentonites from room temperature to 150 °C. The pressure of the confined cell increased with increasing water content of the compacted bentonite, and the pressure changes were similar up to 100 °C irrespective of the presence of the 1-cm air gaps. Moreover, the pressure values at 150 °C were 10–15% higher in samples without gaps. |
---|---|
ISSN: | 2214-157X 2214-157X |
DOI: | 10.1016/j.csite.2023.103458 |