The Critical Path Method In Management Information System of Contractor Service Company Using Incremnetal Model

Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. XYZ Surabaya is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Buana Information Technology and Computer Sciences (Online) 2023-01, Vol.4 (1), p.19-23
Hauptverfasser: Tohari, Hamim, Kudhori, Ahmad, Pandowo, Hedi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Good control is needed in managing a project, starting from controlling the human resources to systematic scheduling. CV. XYZ Surabaya is a contractor service company, that does not yet have an information system that can be used as a control tool in project management. Critical Path Method (CPM) is one method that can be used to schedule projects. This study aims to design a project management information system by implementing CPM. The system design is done using the Incremental Model. The results of this study are in the form of a prototype system that fits the needs of CV. XYZ Surabaya, includes system flow, Contextual Data Model (CDM), and User Interface (UI).