Monitoring of PV Inverters while Unintentional Islanding Using PMU

Unintentional islanding detection is one the mandatory criterion that must be met by PV inverters before connecting them into the grid. Acceptable time for inverter for islanding detection is less than 2 seconds. In this paper voltage parameters after islanding occurrence and before turning off the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International Journal of Electronics and Telecommunications 2021-01, Vol.67 (3), p.465-470
Hauptverfasser: Barczentewicz, Szymon Henryk, Lerch, Tomasz, Bień, Andrzej
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Unintentional islanding detection is one the mandatory criterion that must be met by PV inverters before connecting them into the grid. Acceptable time for inverter for islanding detection is less than 2 seconds. In this paper voltage parameters after islanding occurrence and before turning off the inverter are analyzed. In order to simulate islanding state and perform measurements the testing system was build. Three different commercial PV inverters were tested. Measured signals were used to calculate voltage envelope, phasor, frequency and ROCOF. Collected data proved to be helpful to compere different inverters.
ISSN:2081-8491
2300-1933
DOI:10.24425/ijet.2021.137835