Thermal process simulation and multi-variable study/optimization of a novel geothermal-driven multi-generation process using bi-evaporator with zeotropic mixture

Bi-evaporator technology is a robust tool, operating in two levels of coolant production for normal cooling and freezing purposes. The current study is motivated to assess the feasibility of integrating a bi-evaporator technology and a single-flash geothermal power plant. The main novelty of this pa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Case studies in thermal engineering 2023-03, Vol.43, p.102790, Article 102790
Hauptverfasser: Zhan, Mingwang, Mansir, Ibrahim B., Singh, Pradeep Kumar, Rajab, Husam, Abed, Azher M., Dahari, Mahidzal, Nasr, Samia, Khan, Ilyas, Eldin, Sayed M., Sui, Dianjie
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Bi-evaporator technology is a robust tool, operating in two levels of coolant production for normal cooling and freezing purposes. The current study is motivated to assess the feasibility of integrating a bi-evaporator technology and a single-flash geothermal power plant. The main novelty of this paper is to design a novel combined cooling and power (CCP) production cycle relying on an organic Rankin cycle and a modified bi-evaporator refrigeration cycle. In addition, the use of a zeotropic mixture (Pentane/Isobutane) fed to the CCP is another difference between the current research and the available literature review. In addition to the power and cooling, the entire system is boosted by the use of a multi-generation process, producing heating via a heating production unit and hydrogen (H2) via a low-temperature electrolyzer. The proposed system was analyzed from the energy, exergy, specific exergy costing, and net present value points of view. Therefore, a coherent single- and dual-sensitivity study is done, and the variability of the main performance metrics is viewed against the decision parameters. In addition, owing to the incompatible trend of the newly devised plant's chief performance metrics, an advanced triple-objective optimization through a NSGA-II method is regraded from the standpoints of thermodynamics and economics. The objective functions include the coefficient of performance, exergy efficiency, and sum unit cost of products, and the optimum solution reveals their values of 33.56%, 63.2%, and 6.0 $/GJ, respectively.
ISSN:2214-157X
2214-157X