MERRA2 derived time series of GB telecommunications infrastructure electricity load, using historical daily surface temperature
MERRA2 re-analysis data (1981-2023, 2m temperature) is used to calculate the daily electricity load of telecommunications infrastructure in GB, London, and North Scotland. The model has been trained on BT group plc data, 2016-2020, to investigate the extent of weather-variability in causing extreme...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Dataset |
Sprache: | eng |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | MERRA2 re-analysis data (1981-2023, 2m temperature) is used to calculate the daily electricity load of telecommunications infrastructure in GB, London, and North Scotland. The model has been trained on BT group plc data, 2016-2020, to investigate the extent of weather-variability in causing extreme demand events in heating- and cooling- driven infrastructure. |
---|---|
DOI: | 10.17864/1947.000533 |