The questionnaire survey of traditional architecture preliminary design workflow
A comparison of the time consumed by the traditional architecture preliminary design workflow and the BIM-based architecture preliminary design workflow is performed to determine the difference between the two. The time-consumption of the traditional design workflow is evaluated in the form of a que...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Dataset |
Sprache: | eng |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A comparison of the time consumed by the traditional architecture preliminary design workflow and the BIM-based architecture preliminary design workflow is performed to determine the difference between the two. The time-consumption of the traditional design workflow is evaluated in the form of a questionnaire, based on feedback from industry practitioners and experts. |
---|---|
DOI: | 10.17632/pvh6ffm7sf |