Compartmental Fire Temperature Data from Body and Platform-mounted Sensors in Live Fire-Suppression Exercises
The data comprises of time-stamped temperature values in degrees Celsius recorded during fire-suppression exercises conducted at various UK and US fire-training facilities. The first day of the visit was split into two burn sessions as follows: • The first being a demonstration of gas cooling perfor...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Dataset |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The data comprises of time-stamped temperature values in degrees Celsius recorded during fire-suppression exercises conducted at various UK and US fire-training facilities. The first day of the visit was split into two burn sessions as follows: • The first being a demonstration of gas cooling performed in a “lay-flat” chamber. • The second being a re-qualification exercise performed in the multi-compartment chamber. Day 1 - Session 1: Lay-flat chamber Two TMRDs (#5 & #6) were worn in the torch clips on the breathing apparatus (BA) harnesses by the instructors during their demonstration of the “gas cooling” technique for controlling a fire. The fire was lit in the right hand corner of the chamber and as the demonstrations progresses with the fire being allowed to repeatedly develop and then “gas cooling” being deployed the fire progressed to include the fuel in the left hand corner of the chamber. The data logged temperatures show the cycles and the effect of the “gas cooling” technique. Day 1 – Session 2: Multi-compartment chamber Three TMRDs (#5, #7 and #8) were worn in the same position as before by the instructors during the re-qualification exercise (Figure 3). Two other TMRDs were attached to a stand at 1.3m high (#6) and 1.7m high (#9) and the stand was placed in the corner of the burn chamber for the duration of the exercise. The second day was again split into two burn sessions utilising the “Industrial B” building with the firefighting team using standard operating procedures to extinguish the fires. 1.1 Day 2 - Session 1: Top-floor industrial unit B Session 1 was conducted on the upper floor of the building which has a high ceiling where 2 double loadings of fuel were used. Three TMRD units were deployed, one on the helmet and one at chest height on the team fighting the fire and the third on the observer at shoulder height. In this session, 3 TMRDs were used with #B mounted on the helmet of one of the firefighters tackling the burn, #D mounted on the chest of the other firefighter and #C was on the shoulder of the observer. 1.2 Day 2 - Session 2: Lower-floor industrial unit B Session 2 was conducted on the lower floor of the building which has a standard height ceiling where 1 double and 1 single loading of fuel were used. In this session, a total of three TMRD units were deployed, one on the helmet and one at shoulder height on the team fighting the fire and the third on the observer at shoulder height In this session, one double and one single |
---|---|
DOI: | 10.17632/pn7y7sskc7.3 |