Rework in Urban Renewal Projects in Colombia

AbstractThere is a paucity of systematic knowledge on the dynamics of rework in urban renewal projects even though such projects frequently exceed budget and schedule. The causal factors of rework and cost impact on 69 Colombian public projects are examined. The nomenclature of project, organization...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of infrastructure systems 2017-06, Vol.23 (2)
Hauptverfasser: Forcada, Nuria, Alvarez, Angela P, Love, Peter E. D, Edwards, David J
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:AbstractThere is a paucity of systematic knowledge on the dynamics of rework in urban renewal projects even though such projects frequently exceed budget and schedule. The causal factors of rework and cost impact on 69 Colombian public projects are examined. The nomenclature of project, organization, and people (POP) is used to categorize causal variables and develop a generic systemic model of rework causation. Inadequate initial budgets, poor project design (which instigated changes during construction), and the social inclusivity of contracts in Colombia (which employ local inexperienced people to conduct the required work) were the most significant contributors of rework. The developed model provides decision makers and stakeholders with insights about the interdependencies and behavior between key influencing variables in Colombian urban renewal projects, and can be used to stimulate learning and process improvements in future projects.
ISSN:1076-0342
1943-555X
DOI:10.1061/(ASCE)IS.1943-555X.0000332