Rekhes Nafḥa
At the end of December 2003 and the beginning of January 2004 a salvage excavation was conducted at Rekhes Nafha ((Permit No. A-4068*; map ref. NIG 1790/5118; OIG 1290/0118; HA-ESI 115:66*–67*), following damage to antiquities caused while preparing a dirt road for the erection of an electric pole....
Gespeichert in:
Veröffentlicht in: | חדשות ארכיאולוגיות: חפירות וסקרים בישראל 2008-01 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | At the end of December 2003 and the beginning of January 2004 a salvage excavation was conducted at Rekhes Nafha ((Permit No. A-4068*; map ref. NIG 1790/5118; OIG 1290/0118; HA-ESI 115:66*–67*), following damage to antiquities caused while preparing a dirt road for the erection of an electric pole. The excavation, carried out on behalf of the Antiquities Authority and funded by the Electric Company, was directed by M. Haiman, with the assistance of A. Hajian (surveying and drafting) and K. Vardi of Ben-Gurion University (dating of the flint implements). |
---|---|
ISSN: | 1565-5334 1565-5334 |
DOI: | 10.69704/jhaesi.116.2004.697 |