The modernization problem for high-speed tracks and adaptation to EU standards

The article will present aspects related to the construction (modernization) of railway lines in Poland on the example of the modernized section of the railway line E20 Warsaw-Terespol. The purpose of the modernization of this line was to adjust its technical parameters to the EU standards and requi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:WUT Journal of Transportation Engineering 2019-03, Vol.124, p.9-17
1. Verfasser: Chrzan, Marcin
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The article will present aspects related to the construction (modernization) of railway lines in Poland on the example of the modernized section of the railway line E20 Warsaw-Terespol. The purpose of the modernization of this line was to adjust its technical parameters to the EU standards and requirements of AGC (European Agreement on Main International Railway Lines) and AGTC (European Agreement on Main International Combined Transport Lines and Associated Facilities) agreements, which provide for a maximum permissible speed of 160 km/h for steam passenger trains and 120 km/h for freight trains, with a permissible axle load of 22.5 tons. It will present the previous results of measurements on selected sections and the original concept of rail measurements using ultrasonic defectoscopy and satellite navigation.
ISSN:1230-9265
DOI:10.5604/01.3001.0013.6630