A series of lateral loading test of the Geosynthetic-Reinforced Soil integral bridge

Integral bridge of rahmem construction can omit shoe. And integral bridge can slim concrete section of bridge. Follow, integral bridge is built in America and Europe as highway bridge. But integral bridge has problem of settlement of back banking generated with expansion and contraction of beam by t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Geosynthetics Engineering Journal 2012, Vol.27, pp.157-164
Hauptverfasser: SUGA, Motoaki, NONAKA, Takahiro, KURIYAMA, Ryosuke, KOJIMA, Kenichi, KODA, Masayuki
Format: Artikel
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Integral bridge of rahmem construction can omit shoe. And integral bridge can slim concrete section of bridge. Follow, integral bridge is built in America and Europe as highway bridge. But integral bridge has problem of settlement of back banking generated with expansion and contraction of beam by temperature change. Authors developed Geosynthethic-Reinforced Soil integral bridge, which made to unify the Geosynthethic-Reinforced Soil structure and integral bridge as construction method solves above problem. In this paper, authors did lateral loading test of actual size scale bridge supposing earthquake and the temperature change this time. As a result, the stability and high earthquake resistance of this structure has been checked.
ISSN:1344-6193
1883-146X
DOI:10.5030/jcigsjournal.27.157