New Evidence of Post-Destruction Reuse in the Main Building of the Palace of Nestor at Pylos
In the past three decades, an Iron Age date for reoccupation of areas surrounding the Palace of Nestor on the Epano Englianos Ridge has become well attested, but the extent and nature of this reoccupation has remained unclear. My reexamination of the Main Building stratigraphy using data recorded in...
Gespeichert in:
Veröffentlicht in: | American journal of archaeology 2016-01, Vol.120 (1), p.151-157 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In the past three decades, an Iron Age date for reoccupation of areas surrounding the Palace of Nestor on the Epano Englianos Ridge has become well attested, but the extent and nature of this reoccupation has remained unclear. My reexamination of the Main Building stratigraphy using data recorded in the excavation notebooks has helped define the extent of reoccupation by providing evidence for two phases of temporary reuse. The first phase of reuse, which dates between the final destruction and the early 10th century B.C.E., occurred inside small areas of the Main Building that had not yet collapsed. The second phase occurred on top of and around the Main Building ruins and has a terminus post quem of the early 10th century B.C.E. My reanalysis confirms a more complex site history than originally recognized and bears tremendous implications for looting and other disturbances to the remains. This article is open access at AJA Online. Figures can also be found under this article’s abstract on (AJA Online). |
---|---|
ISSN: | 0002-9114 1939-828X |
DOI: | 10.3764/aja.120.1.0151 |