Topographical Change in a Channel Bed after Habitat Improvement

Concrete blocks were removed in the winter of 1993 to 1994 for habitat improvement of aquatic animals in the bed of a concrete-lined reach of the Pankenai River, northern Hokkaido, Japan. Since the mudstone which lies under the concrete blocks is soft under water-saturated conditions, the channel be...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Japanese Journal of Limnology (Rikusuigaku Zasshi) 1996/06/01, Vol.57(2), pp.193-197
Hauptverfasser: KURASHIGE, Yoshimasa, TOYOSHIMA, Teruo, NAKANO, Shigeru
Format: Artikel
Sprache:eng ; jpn
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Concrete blocks were removed in the winter of 1993 to 1994 for habitat improvement of aquatic animals in the bed of a concrete-lined reach of the Pankenai River, northern Hokkaido, Japan. Since the mudstone which lies under the concrete blocks is soft under water-saturated conditions, the channel bed was seriously eroded during a snowmelt season just after the improvement. This study reports the topography of the channel bed after the snowmelt.
ISSN:0021-5104
1882-4897
DOI:10.3739/rikusui.57.193