Cost and Scope Breakdown Structure for Functional Level Estimating of Consultant Fees

Estimating the cost of preconstruction services (PCSs) during the early phases of highway project development is an important task requiring an increased level of attention. Research has found a link between early investment in PC planning and design services and final project costs. The purpose of...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Transportation research record 2016, Vol.2573 (1), p.157-163
Hauptverfasser: Craigie, Emily K., Gransberg, Douglas D., Jeong, H. David
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Estimating the cost of preconstruction services (PCSs) during the early phases of highway project development is an important task requiring an increased level of attention. Research has found a link between early investment in PC planning and design services and final project costs. The purpose of this paper is to assess current estimating practices and propose a cost and scope breakdown structure (CSBS) framework to structure functional level estimation of consultant fees. Such a framework is promoted to reduce the chance that underfunded PCSs may degrade postaward construction contract cost certainty. This study found that PCSs were generally viewed as a minor component of a project’s budget and were sometimes estimated without subsequent preconstruction cost control or accountability. Current practices for consultant fee estimating by state departments of transportation (DOTs) documented in this study show little standardization in estimating practices across and within transportation agencies. As a consequence, many individuals are creating their own tools to develop PCS cost estimates. The result is that national and regional consultants that work in more than a single state are forced to expend additional effort to maintain agency-specific work task databases; the cost no doubt is passed back to the agency in increased overhead costs. This study found that application of a CSBS to classify specific work tasks and utilization of a database of previous project cost information promote consistency and aid contract negotiations with consultants.
ISSN:0361-1981
2169-4052
DOI:10.3141/2573-19