Transitions from Guardrail to Bridge Rail That Meet Safety Performance Requirements

Three guardrail-to-bridge rail transitions were developed and subjected to full-scale crash tests. The transitions were (a) a nested W-beam with W-beam rub rail that transitioned from a W-beam guardrail to a vertical concrete parapet bridge rail, (b) a nested thrie-beam that transitioned from a W-be...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Transportation research record 2000, Vol.1720 (1), p.30-43
Hauptverfasser: Eugene Buth, C., Menges, Wanda L., Mak, King K., Bligh, Roger P.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Three guardrail-to-bridge rail transitions were developed and subjected to full-scale crash tests. The transitions were (a) a nested W-beam with W-beam rub rail that transitioned from a W-beam guardrail to a vertical concrete parapet bridge rail, (b) a nested thrie-beam that transitioned from a W-beam guardrail to a tubular steel bridge rail, and (c) a tubular steel transition that transitioned from a weak-post box-beam guardrail to a tubular steel bridge rail. The nested W-beam and the tubular steel transitions were tested and met NCHRP Report 350 Test Level (TL)-3 requirements. The nested thrie-beam transition was tested and met TL-4 requirements.
ISSN:0361-1981
2169-4052
DOI:10.3141/1720-04