An Optimization for Ore Stockyard Layout Operation Schedules Using Multi-Start Greedy Algorithm

We have developed an optimal scheduling method for the highly efficient management of multiple stockpiles of iron ore in the stockyard to significantly improve both yard logistics and the operational stability of steelworks.The ore stockyard layout problem is to make inventory schedules for the purp...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Tetsu to hagane 2023/11/01, Vol.109(11), pp.857-864
Hauptverfasser: Kumano, Akira, Yoshinari, Yusuke, Yamaguchi, Osamu, Miyazawa, Toru
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We have developed an optimal scheduling method for the highly efficient management of multiple stockpiles of iron ore in the stockyard to significantly improve both yard logistics and the operational stability of steelworks.The ore stockyard layout problem is to make inventory schedules for the purpose of cost minimization under several constraints such as uptime of facilities. While the number of stockpiles generally must be minimized for efficiency, excessive minimization can raise the risk of undelivery of iron ore if the required transport equipment become unavailable due to daily maintenance or a mechanical problem. The key, therefore, is to devise a plan that realizes both efficient yard operations and stable steelworks operation.In response, we developed Stockpile Layout Planner which optimizes yard operations by creating ideal plans for up to several months with multi-start Greedy based algorithm that completes complicated logistical calculations in less than one minute. The new method ensures that such logistics are handled efficiently to realize highly stable ore management.
ISSN:0021-1575
1883-2954
DOI:10.2355/tetsutohagane.TETSU-2023-043