EXAMINATION ON THE DESIGN METHOD AND INFILTRATION PROPERTIES OF THE RESERVOIR PAVEMENT AND THE INFILTRATION FACILITIES

Arrival and departure lines are necessary over 500m per 1 line over the extension for container yard of the railway freight facilities of the arrival and departure line cargo handling system. In addition, the area of container yard becomes about 1.5-2.0ha for disposal of goods by the forklift for th...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:JOURNAL OF PAVEMENT ENGINEERING, JSCE JSCE, 2005/12/16, Vol.10, pp.99-106
Hauptverfasser: MIURA, Yasuo, NAKAZONO, Hiroshi, SAIGUSA, Yoshimichi, ABE, Nagato, MANABE, Kazunori
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!