Production sequencing in a flow shop system using optimization and heuristic algorithms

The purpose of the research was to determine the sequencing of the production of n jobs in m operations in a small footwear company in an environment of flow shop machine characteristics, which optimizes the total time of completion of the job in the production system (Makespan). We used heuristic a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Gestão & Produção 2021-03, Vol.28 (1)
Hauptverfasser: Caicedo-Rolón Junior, Álvaro, Llanos, John Wilmer Parra
Format: Artikel
Sprache:eng ; por
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The purpose of the research was to determine the sequencing of the production of n jobs in m operations in a small footwear company in an environment of flow shop machine characteristics, which optimizes the total time of completion of the job in the production system (Makespan). We used heuristic algorithms that were applied through Lekin and WinQSB softwares, and for the optimization algorithm we designed a mathematical model that was solved by Juliabox software. Results show that the integer linear programming and local search minimize the makespan with 3807 minutes, and different production sequences for each algorithm, which consider permutation, which improves the traditional way of programming the production in 97 minutes, however, the optimization presents better results in the performance measures of average waiting time, average time of flow, and average job in process. Application of heuristic algorithms proves to be simple and fast, but the mathematical model of optimization designed and encoded in the software is a flexible and valuable tool for decision making in production programming, which could be applied in other footwear companies, and in other productive sectors whose companies have the same characteristics of the case study, reducing costs and improving delivery times. resumo: O propósito da pesquisa foi determinar o sequenciamento da produção de n trabalhos em m operações em uma empresa de calçado de pequeno porte com características de um sistema de máquinas flow shop, que otimize o tempo total de conclusão dos trabalhos no sistema de produção (makespan). Se utilizaram algoritmos heurísticos que foram aplicados por meio dos softwares Lekin e WinQSB, e para o algoritmo de optimização se design um modelo matemático que foi resolvido pelo software Juliabox. Os resultados evidenciam que a programação linear inteira e local search minimizam o makespan com 3807 minutos, e sequências de produção diferente para cada algoritmo, que consideram a permutação, o que melhoram a maneira tradicional de programar a produção em 97 minutos, no entanto, a otimização tem melhores resultados em medidas de desempenho do tempo médio de espera, tempo médio de fluxo e trabalho médio em processo. Se destaca o simples e rápido da aplicação dos algoritmos heurísticos, mas o modelo matemático de optimização desenvolvido e codificado no software se constitui em uma ferramenta flexível e valiosa para a toma de decisões na programação da produção, que pode ser apli
ISSN:0104-530X
1806-9649
1806-9649
DOI:10.1590/1806-9649.2020v28e3886