On Scheduling Unit-Length Jobs with Multiple Release Time/Deadline Intervals

We consider the problem of scheduling n unit-time jobs with multiple release time/deadline intervals, which are intervals of time in which the job can be scheduled. A feasible schedule is one in which each job is run in its entirety within one of its release time/deadline intervals. We show that the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Operations research 1984-01, Vol.32 (1), p.80-88
Hauptverfasser: Simons, Barbara, Sipser, Michael
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We consider the problem of scheduling n unit-time jobs with multiple release time/deadline intervals, which are intervals of time in which the job can be scheduled. A feasible schedule is one in which each job is run in its entirety within one of its release time/deadline intervals. We show that the general problem is NP-complete, but that for a special case one can determine in polynomial time if a feasible schedule exists. If there is a feasible schedule for the special case, then it is possible to obtain both a schedule that minimizes the maximum completion time and also one that minimizes the sum of the completion times of all jobs. If, on the other hand, there is no feasible schedule, then one can determine the minimum number of jobs that must be removed to make the problem instance feasible.
ISSN:0030-364X
1526-5463
DOI:10.1287/opre.32.1.80