A Genetic Algorithm for a Two-Machine Flowshop with a Limited Waiting Time Constraint and Sequence-Dependent Setup Times
This study considers a two-machine flowshop with a limited waiting time constraint between the two machines and sequence-dependent setup times on the second machine. These characteristics are motivated from semiconductor manufacturing systems. The objective of this scheduling problem is to minimize...
Gespeichert in:
Veröffentlicht in: | Mathematical problems in engineering 2020, Vol.2020 (2020), p.1-13 |
---|---|
1. Verfasser: | |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This study considers a two-machine flowshop with a limited waiting time constraint between the two machines and sequence-dependent setup times on the second machine. These characteristics are motivated from semiconductor manufacturing systems. The objective of this scheduling problem is to minimize the total tardiness. In this study, a mixed-integer linear programming formulation was provided to define the problem mathematically and used to find optimal solutions using a mathematical programming solver, CPLEX. As CPLEX required a significantly long computation time because this problem is known to be NP-complete, a genetic algorithm was proposed to solve the problem within a short computation time. Computational experiments were performed to evaluate the performance of the proposed algorithm and the suggested GA outperformed the other heuristics considered in the study. |
---|---|
ISSN: | 1024-123X 1563-5147 |
DOI: | 10.1155/2020/8833645 |