Investigation and adjustment of the pilot power unit equipped with a K-300-170-1R turbine produced by OAO Silovye Mashiny

Results obtained from investigations and adjustment works on a K-300-170-1R steam turbine carried out concurrently with a comprehensive set of works (adjustment of the support and suspension system of pipelines, analysis of thermal expansions of the cylinders and operating conditions of the bearings...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Thermal engineering 2012, Vol.59 (9), p.647-652
Hauptverfasser: Lisyanskii, A. S., Sukhorukov, E. M., Nazarov, V. V., Shklyarov, M. I., Mironov, A. M., Nasredinov, V. D., Ryzhkov, A. A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Results obtained from investigations and adjustment works on a K-300-170-1R steam turbine carried out concurrently with a comprehensive set of works (adjustment of the support and suspension system of pipelines, analysis of thermal expansions of the cylinders and operating conditions of the bearings, optimization of the steam admission system, balancing works, and others) aimed at improving the turbine unit vibration performance are presented. The use of such integrated approach makes it possible to efficiently settle matters concerned with removing increased vibration of a turbine unit.
ISSN:0040-6015
1555-6301
DOI:10.1134/S0040601512090078