Experience gained with development of the instrumentation and control system for the PGU-410 power unit at the Krasnodar cogeneration station on the basis of the tornado-n distributed control system

The development of the instrumentation and control system for the PGU-410 power unit at the Krasnodar cogeneration station is discussed. Problems encountered in designing the process control system of a complex facility are considered, in particular, the need to integrate local control systems. Spec...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Thermal engineering 2011, Vol.58 (10), p.817-823
Hauptverfasser: Serdyukov, O. V., Nestulya, R. V., Kulagin, S. A., Skvortsov, A. N., Timoshin, A. I., Zhuravleva, L. V., Paseko, S. M., Kamochkin, A. V.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The development of the instrumentation and control system for the PGU-410 power unit at the Krasnodar cogeneration station is discussed. Problems encountered in designing the process control system of a complex facility are considered, in particular, the need to integrate local control systems. Special attention is paid to the importance of setting up a united control area at such facilities.
ISSN:0040-6015
1555-6301
DOI:10.1134/S0040601511100089