A Metric and Market Construct of Inter-Temporal Flexibility in Time-Coupled Economic Dispatch
The increasing penetration of variable and uncertain generation from renewable resources poses a challenge for balancing the power system supply and demand. Violations of this constraint seriously impact system reliability and thus carry with them a very high cost. In order to address the issues cre...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power systems 2016-09, Vol.31 (5), p.3437-3446 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The increasing penetration of variable and uncertain generation from renewable resources poses a challenge for balancing the power system supply and demand. Violations of this constraint seriously impact system reliability and thus carry with them a very high cost. In order to address the issues created by variable generation increased system flexibility is required. System operators are considering modifications to the conventional real-time economic dispatch model to provide improved ramp flexibility. In this paper an operational flexibility metric called lack of ramp probability (LORP) is proposed for the real-time economic dispatch. Further, a two-step robust optimization based framework is introduced to simultaneously guarantee LORP flexibility metric and ensure ramp deliverability in a multi-zonal setting. The proposed framework is illustrated on a 3-zone modified IEEE 73 bus (RTS-96) test system. |
---|---|
ISSN: | 0885-8950 1558-0679 |
DOI: | 10.1109/TPWRS.2015.2495118 |