A Metric and Market Construct of Inter-Temporal Flexibility in Time-Coupled Economic Dispatch

The increasing penetration of variable and uncertain generation from renewable resources poses a challenge for balancing the power system supply and demand. Violations of this constraint seriously impact system reliability and thus carry with them a very high cost. In order to address the issues cre...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power systems 2016-09, Vol.31 (5), p.3437-3446
Hauptverfasser: Thatte, Anupam A., Le Xie
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The increasing penetration of variable and uncertain generation from renewable resources poses a challenge for balancing the power system supply and demand. Violations of this constraint seriously impact system reliability and thus carry with them a very high cost. In order to address the issues created by variable generation increased system flexibility is required. System operators are considering modifications to the conventional real-time economic dispatch model to provide improved ramp flexibility. In this paper an operational flexibility metric called lack of ramp probability (LORP) is proposed for the real-time economic dispatch. Further, a two-step robust optimization based framework is introduced to simultaneously guarantee LORP flexibility metric and ensure ramp deliverability in a multi-zonal setting. The proposed framework is illustrated on a 3-zone modified IEEE 73 bus (RTS-96) test system.
ISSN:0885-8950
1558-0679
DOI:10.1109/TPWRS.2015.2495118