Transmission Network Expansion Planning With Complex Power Flow Models

In recent years, the transmission network expansion planning (TNEP) problem has become increasingly complex. As this problem is a nonlinear and nonconvex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the TNEP problem. Until recently, these...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power systems 2012-05, Vol.27 (2), p.904-912
Hauptverfasser: Bent, R., Toole, G. L., Berscheid, A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In recent years, the transmission network expansion planning (TNEP) problem has become increasingly complex. As this problem is a nonlinear and nonconvex optimization problem, researchers have traditionally focused on approximate models of power flows to solve the TNEP problem. Until recently, these approximations have produced results that are straightforward to adapt to the more complex problem. However, the power grid is evolving towards a state where the adaptations are no longer as easy (e.g., large amounts of limited control, renewable generation), necessitating new approaches. In this paper, we propose a discrepancy-bounded local search (DBLS) that encapsulates the complexity of power flow modeling in a black box that may be queried for information about the quality of a proposed expansion. This allows the development of an optimization algorithm that is decoupled from the details of the underlying power model. Case studies are presented to demonstrate cost differences in plans developed under different power flow models.
ISSN:0885-8950
1558-0679
DOI:10.1109/TPWRS.2011.2169994