The Use of Partial Discharges as an Online Monitoring System for Underground Cable Joints
With their vast amount of joints, underground cable systems are expensive to maintain; therefore, measurement equipment must be cost-effective. This study proposes the long-term placement of partial-discharge (PD) monitoring units at cable joints. The unit consists of a peak detect circuit and a dig...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power delivery 2011-07, Vol.26 (3), p.1585-1591 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | With their vast amount of joints, underground cable systems are expensive to maintain; therefore, measurement equipment must be cost-effective. This study proposes the long-term placement of partial-discharge (PD) monitoring units at cable joints. The unit consists of a peak detect circuit and a digital signal processor for acquiring and converting the sensors' PD signals into discharge sequence data, whose data are then provided to a remote computer for analysis and display of the condition of the cable joint. Finally, a cable joint with artificial defects was tested by accelerated aging tests to verify the performance of the equipment. Two characteristics, namely, the average discharge quantity (Q ave ) and the discharge phase region, are proposed and plotted against each other to render an evolution locus, which reveals a shape of an upside-down letter N. The locus allows a judgment to be made on the state of the insulation in the cable joint. These results further justify work to further develop the method as an online cable monitoring system. |
---|---|
ISSN: | 0885-8977 1937-4208 |
DOI: | 10.1109/TPWRD.2011.2124474 |