Selection of Installed Capacities for Hydroelectric Power Plants in Series

The paper presents a procedure for selecting the installed capacities of several interdependent power plants to be built in series on a river, taking into account the stochasticity of the river flows. It is shown that the capacity of a power plant should be increased until the marginal construction...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power apparatus and systems 1984-09, Vol.PAS-103 (9), p.2699-2707
1. Verfasser: Turgeon, Andre
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The paper presents a procedure for selecting the installed capacities of several interdependent power plants to be built in series on a river, taking into account the stochasticity of the river flows. It is shown that the capacity of a power plant should be increased until the marginal construction cost exceeds the expected marginal benefit from the firm and secondary power produced. The expected benefit is determined by performing Monte Carlo simulations of the equipment operation. The operating policy used in the simulation is determined by straightforward dynamic programming if n, the number of reservoirs, is less than or equal to four. Otherwise, the operating problem is decomposed into n-i problems of two variables each, which are solved by dynamic programming. Numerical results are presented.
ISSN:0018-9510
2995-6323
DOI:10.1109/TPAS.1984.318243