Environmental Effects of the Nelson River HVDC Transmission Lines-RI, An, Electric Field, Induced Voltage and Ion Current Distribution Tests
The two Manitoba Hydro 895 km (556 mile) Nelson River dc lines were completed in 1971. Since that time, under various system voltages, radio interference and corona power loss have been measured on these lines and reported on (1) (2). This paper reports on the electrical environmental effect tests c...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power apparatus and systems 1982-04, Vol.PAS-101 (4), p.951-959 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The two Manitoba Hydro 895 km (556 mile) Nelson River dc lines were completed in 1971. Since that time, under various system voltages, radio interference and corona power loss have been measured on these lines and reported on (1) (2). This paper reports on the electrical environmental effect tests conducted in 1979 including coordinated measurements of radio interference, audible noise, electric field, induced voltage, and ion flow. |
---|---|
ISSN: | 0018-9510 2995-6323 |
DOI: | 10.1109/TPAS.1982.317161 |