A Contribution to Safe Railway Operation: Evaluating the Effect of Electromagnetic Disturbances on Balise-to-BTM Communication in Railway Control Signaling Systems

Electromagnetic (EM) disturbances and compatibility issues are the most common problems affecting communication and signaling systems. The duration of field testing to solve these railway EM interference (EMI) problems may vary between three and 12 months, with the cost of the complete process betwe...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE vehicular technology magazine 2021-06, Vol.16 (2), p.104-112
Hauptverfasser: Franco, David, Aguado, Marina, Pinedo, Christian, Lopez, Igor, Adin, Inigo, Mendizabal, Jaizki
Format: Magazinearticle
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Electromagnetic (EM) disturbances and compatibility issues are the most common problems affecting communication and signaling systems. The duration of field testing to solve these railway EM interference (EMI) problems may vary between three and 12 months, with the cost of the complete process between €25,000 and €1.5 million [1]. Currently, the railway industry demands the building of strategies and tools to promote paths toward zero on-site testing [2] and reduce the duration of field tests; however, there is a lack of laboratory testing resources for these approaches.
ISSN:1556-6072
1556-6080
DOI:10.1109/MVT.2021.3051567