Improvement of thermal efficiency for combined cycle power plant during load following operation
An optimization method for unit startup and shutdown timing in the load control system is proposed for combined cycle power plants to improve thermal efficiency during load following operation. The optimum timings are derived from regression equations obtained through offline dynamics simulation ana...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on electron devices 1999-09, Vol.14 (3), p.787-794 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | An optimization method for unit startup and shutdown timing in the load control system is proposed for combined cycle power plants to improve thermal efficiency during load following operation. The optimum timings are derived from regression equations obtained through offline dynamics simulation analysis. The system is applied to a simulation for a plant of a three-pressure staged reheat type (1650 MW rated capacity) which consists of seven units, and the following points are seen: (1) the larger the load change amount is, the earlier the recommended additional startup timing is; (2) the tendency described in (1) is more remarkable when the load change is faster; and (3) thermal efficiency is expected to be increased by 9% compared with the conventional method. |
---|---|
ISSN: | 0885-8969 0018-9383 1558-0059 1557-9646 |
DOI: | 10.1109/60.790952 |