Improvement of thermal efficiency for combined cycle power plant during load following operation

An optimization method for unit startup and shutdown timing in the load control system is proposed for combined cycle power plants to improve thermal efficiency during load following operation. The optimum timings are derived from regression equations obtained through offline dynamics simulation ana...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on electron devices 1999-09, Vol.14 (3), p.787-794
Hauptverfasser: Matsumoto, H., Takahasi, S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:An optimization method for unit startup and shutdown timing in the load control system is proposed for combined cycle power plants to improve thermal efficiency during load following operation. The optimum timings are derived from regression equations obtained through offline dynamics simulation analysis. The system is applied to a simulation for a plant of a three-pressure staged reheat type (1650 MW rated capacity) which consists of seven units, and the following points are seen: (1) the larger the load change amount is, the earlier the recommended additional startup timing is; (2) the tendency described in (1) is more remarkable when the load change is faster; and (3) thermal efficiency is expected to be increased by 9% compared with the conventional method.
ISSN:0885-8969
0018-9383
1558-0059
1557-9646
DOI:10.1109/60.790952