Cost aspects of AGC, inadvertent energy and time error
Information is presented dealing with various cost aspects associated with automatic generation control (AGC), inadvertent energy, and time error. A general overview is given of the AGC operating costs. Quantification of the various operating costs is also provided. Reserve liability is described, a...
Gespeichert in:
Veröffentlicht in: | IEEE transactions on power systems 1990-02, Vol.5 (1), p.111-118 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Information is presented dealing with various cost aspects associated with automatic generation control (AGC), inadvertent energy, and time error. A general overview is given of the AGC operating costs. Quantification of the various operating costs is also provided. Reserve liability is described, and the rate-to-control costs when purchasing the AGC capability are outlined. Economic implications of inadvertent energy are considered. Finally, the cost impact of time error and time error correction are presented.< > |
---|---|
ISSN: | 0885-8950 1558-0679 |
DOI: | 10.1109/59.49094 |