Cost aspects of AGC, inadvertent energy and time error

Information is presented dealing with various cost aspects associated with automatic generation control (AGC), inadvertent energy, and time error. A general overview is given of the AGC operating costs. Quantification of the various operating costs is also provided. Reserve liability is described, a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE transactions on power systems 1990-02, Vol.5 (1), p.111-118
Hauptverfasser: Henderson, P.D., Klaiman, H., Ginnetti, J., Snodgrass, T., Cohn, N., Bloor, S., VanSlyck, L.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Information is presented dealing with various cost aspects associated with automatic generation control (AGC), inadvertent energy, and time error. A general overview is given of the AGC operating costs. Quantification of the various operating costs is also provided. Reserve liability is described, and the rate-to-control costs when purchasing the AGC capability are outlined. Economic implications of inadvertent energy are considered. Finally, the cost impact of time error and time error correction are presented.< >
ISSN:0885-8950
1558-0679
DOI:10.1109/59.49094