Final site assembly and testing of the superconducting toroidal magnet for the CEBAF Large Acceptance Spectrometer (CLAS)

The design, manufacture and works testing of single coils has been reported at ASC, Chicago 1992 and EPAC, London 1994. The assembly, commissioning and testing of the full six-cell toroidal spectrometer magnet is described and the results compared with guaranteed or expected values. The SURA contrac...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEE Transactions on Magnetics 1996-07, Vol.32 (4), p.2074-2076
Hauptverfasser: Street, A.J., Ross, J.S.H., Harrison, S.M., Jenkins, D.M., Mason, M.F., Riggs, R.J., Smith, K.D., Wiatrzyk, J.M., O'Meara, J.E., Tuzel, W., Tilles, D.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The design, manufacture and works testing of single coils has been reported at ASC, Chicago 1992 and EPAC, London 1994. The assembly, commissioning and testing of the full six-cell toroidal spectrometer magnet is described and the results compared with guaranteed or expected values. The SURA contract number for this project is 91-C1882LD.
ISSN:0018-9464
1941-0069
DOI:10.1109/20.508570