An Investigation of Bottleneck Position in a Multi-Stage Job Shop
In this paper, the authors investigate the effects bottleneck machines have on the performance of a multi-stage job shop. The operation performed by the bottleneck and its position in the product Bill of Materials is varied to determine the effects on system performance. It was found that the best p...
Gespeichert in:
Veröffentlicht in: | International journal of operations & production management 1987-06, Vol.7 (6), p.55-63 |
---|---|
Hauptverfasser: | , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In this paper, the authors investigate the effects bottleneck machines have on the performance of a multi-stage job shop. The operation performed by the bottleneck and its position in the product Bill of Materials is varied to determine the effects on system performance. It was found that the best place for the bottleneck machine to be located was at gateway operations located low in the Bill of Materials. |
---|---|
ISSN: | 0144-3577 1758-6593 |
DOI: | 10.1108/eb054808 |