Optimal maintenance intervals for a multi-component system

In the manufacturing industry, preventive maintenance (PM) is carried out to minimise the probability of plant unexpected breakdown. Planned PM is preferred as disruption to operation is then minimised. Suggested PM intervals are normally prepared by the original equipment manufacturers (OEMs), howe...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Production planning & control 2006-12, Vol.17 (8), p.769-779
Hauptverfasser: Tam, A. S. B., Chan, W. M., Price, J. W. H.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In the manufacturing industry, preventive maintenance (PM) is carried out to minimise the probability of plant unexpected breakdown. Planned PM is preferred as disruption to operation is then minimised. Suggested PM intervals are normally prepared by the original equipment manufacturers (OEMs), however due to the multifaceted relationship between operating context and production requirement for different plants, it is unlikely that these suggested intervals as prescribed by the OEMs are optimal. Reliability, budget and breakdown outages cost are some of the critical factors that will affect the calculation of optimal maintenance intervals. Maintenance managers are required to determine optimal maintenance intervals with the above different requirements set by management. In this paper three models are proposed to calculate optimal maintenance intervals for multi-component system in a factory subjected to minimum required reliability, maximum allowable budget and minimum total cost. Numerical examples are provided to illustrate the application and usefulness of the proposed models.
ISSN:0953-7287
1366-5871
DOI:10.1080/09537280600834452