A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia

There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Construction management and economics 2019-02, Vol.37 (2), p.72-88
Hauptverfasser: Azman, Mohd Azrai, Hon, Carol K. H., Skitmore, Martin, Lee, Boon Liat, Xia, Bo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 88
container_issue 2
container_start_page 72
container_title Construction management and economics
container_volume 37
creator Azman, Mohd Azrai
Hon, Carol K. H.
Skitmore, Martin
Lee, Boon Liat
Xia, Bo
description There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to date, by measuring the Total Factor Productivity (TFP) of 37 public-listed Malaysian construction firms over 14 years (2003-2016), based on the Färe-Primont index. In comparing different groups of building, civil and specialist construction firms, this is the first application of a meta-frontier framework to capture the technological gaps involved. Based on the construction firms' financial data, it is found that TFP improvement generally occurs due to Technical Efficiency (TE) and Scale-Mix Efficiency (SME) (largely scope economies), and significant technological gaps exist among different groups. Moreover, the industry suffered a decline in technologically related production environment over the period - prompting the conclusion that long-term policy engagement should focus on technological improvements. The paper provides a robust approach to analysing construction productivity at the firm level that also can be used for accessing productivity components and technological gaps in construction and other industries.
doi_str_mv 10.1080/01446193.2018.1506139
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_crossref_primary_10_1080_01446193_2018_1506139</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2183665910</sourcerecordid><originalsourceid>FETCH-LOGICAL-c338t-b36fc40c8600f9317027e2edbbfb56f0dd9d400bfb0ba13b3f09d152c064f2ec3</originalsourceid><addsrcrecordid>eNp9kc-KFDEQxoMoOK4-ghDw3GOl053t9uSy-A928aLgLaSTykyWdGpMMiPzIL6v3c569VRVH7_6iuJj7LWArYAB3oLoOiVGuW1BDFvRgxJyfMI2olOq6aT88ZRtVqZZoefsRSkPANC1MG7Y7xt-j9U0PlOqATOfse7JcfLcoaX5QCWkHY-Udk3FPHNLqdR8tDVQ4odMbm1PoZ75XzphqoWb5HhFu08UaResiXxnDotced0j92HxiXjC-I7jKThMdhEzzfzeRHMuwbxkz7yJBV891iv2_eOHb7efm7uvn77c3tw1VsqhNpNU3nZgBwXgRymuob3GFt00-alXHpwbXQewTDAZISfpYXSiby2ozrdo5RV7c_FdHvl5xFL1Ax1zWk7qVgxSqX4UsFD9hbKZSsno9SGH2eSzFqDXBPS_BPSagH5MYNl7f9kLyVOezS_K0elqzpGyzybZULT8v8UfXNOQ-A</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2183665910</pqid></control><display><type>article</type><title>A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia</title><source>EBSCO Business Source Complete</source><creator>Azman, Mohd Azrai ; Hon, Carol K. H. ; Skitmore, Martin ; Lee, Boon Liat ; Xia, Bo</creator><creatorcontrib>Azman, Mohd Azrai ; Hon, Carol K. H. ; Skitmore, Martin ; Lee, Boon Liat ; Xia, Bo</creatorcontrib><description>There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to date, by measuring the Total Factor Productivity (TFP) of 37 public-listed Malaysian construction firms over 14 years (2003-2016), based on the Färe-Primont index. In comparing different groups of building, civil and specialist construction firms, this is the first application of a meta-frontier framework to capture the technological gaps involved. Based on the construction firms' financial data, it is found that TFP improvement generally occurs due to Technical Efficiency (TE) and Scale-Mix Efficiency (SME) (largely scope economies), and significant technological gaps exist among different groups. Moreover, the industry suffered a decline in technologically related production environment over the period - prompting the conclusion that long-term policy engagement should focus on technological improvements. The paper provides a robust approach to analysing construction productivity at the firm level that also can be used for accessing productivity components and technological gaps in construction and other industries.</description><identifier>ISSN: 0144-6193</identifier><identifier>EISSN: 1466-433X</identifier><identifier>DOI: 10.1080/01446193.2018.1506139</identifier><language>eng</language><publisher>London: Routledge</publisher><subject>Construction ; Construction companies ; Construction industry ; Decomposition ; firm ; Färe-Primont ; Malaysia ; meta-frontier ; Productivity ; total factor productivity</subject><ispartof>Construction management and economics, 2019-02, Vol.37 (2), p.72-88</ispartof><rights>2019 Informa UK Limited, trading as Taylor &amp; Francis Group 2019</rights><rights>2019 Informa UK Limited, trading as Taylor &amp; Francis Group</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c338t-b36fc40c8600f9317027e2edbbfb56f0dd9d400bfb0ba13b3f09d152c064f2ec3</citedby><cites>FETCH-LOGICAL-c338t-b36fc40c8600f9317027e2edbbfb56f0dd9d400bfb0ba13b3f09d152c064f2ec3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Azman, Mohd Azrai</creatorcontrib><creatorcontrib>Hon, Carol K. H.</creatorcontrib><creatorcontrib>Skitmore, Martin</creatorcontrib><creatorcontrib>Lee, Boon Liat</creatorcontrib><creatorcontrib>Xia, Bo</creatorcontrib><title>A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia</title><title>Construction management and economics</title><description>There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to date, by measuring the Total Factor Productivity (TFP) of 37 public-listed Malaysian construction firms over 14 years (2003-2016), based on the Färe-Primont index. In comparing different groups of building, civil and specialist construction firms, this is the first application of a meta-frontier framework to capture the technological gaps involved. Based on the construction firms' financial data, it is found that TFP improvement generally occurs due to Technical Efficiency (TE) and Scale-Mix Efficiency (SME) (largely scope economies), and significant technological gaps exist among different groups. Moreover, the industry suffered a decline in technologically related production environment over the period - prompting the conclusion that long-term policy engagement should focus on technological improvements. The paper provides a robust approach to analysing construction productivity at the firm level that also can be used for accessing productivity components and technological gaps in construction and other industries.</description><subject>Construction</subject><subject>Construction companies</subject><subject>Construction industry</subject><subject>Decomposition</subject><subject>firm</subject><subject>Färe-Primont</subject><subject>Malaysia</subject><subject>meta-frontier</subject><subject>Productivity</subject><subject>total factor productivity</subject><issn>0144-6193</issn><issn>1466-433X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2019</creationdate><recordtype>article</recordtype><recordid>eNp9kc-KFDEQxoMoOK4-ghDw3GOl053t9uSy-A928aLgLaSTykyWdGpMMiPzIL6v3c569VRVH7_6iuJj7LWArYAB3oLoOiVGuW1BDFvRgxJyfMI2olOq6aT88ZRtVqZZoefsRSkPANC1MG7Y7xt-j9U0PlOqATOfse7JcfLcoaX5QCWkHY-Udk3FPHNLqdR8tDVQ4odMbm1PoZ75XzphqoWb5HhFu08UaResiXxnDotced0j92HxiXjC-I7jKThMdhEzzfzeRHMuwbxkz7yJBV891iv2_eOHb7efm7uvn77c3tw1VsqhNpNU3nZgBwXgRymuob3GFt00-alXHpwbXQewTDAZISfpYXSiby2ozrdo5RV7c_FdHvl5xFL1Ax1zWk7qVgxSqX4UsFD9hbKZSsno9SGH2eSzFqDXBPS_BPSagH5MYNl7f9kLyVOezS_K0elqzpGyzybZULT8v8UfXNOQ-A</recordid><startdate>20190201</startdate><enddate>20190201</enddate><creator>Azman, Mohd Azrai</creator><creator>Hon, Carol K. H.</creator><creator>Skitmore, Martin</creator><creator>Lee, Boon Liat</creator><creator>Xia, Bo</creator><general>Routledge</general><general>E. &amp; F.N. Spon</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20190201</creationdate><title>A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia</title><author>Azman, Mohd Azrai ; Hon, Carol K. H. ; Skitmore, Martin ; Lee, Boon Liat ; Xia, Bo</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c338t-b36fc40c8600f9317027e2edbbfb56f0dd9d400bfb0ba13b3f09d152c064f2ec3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2019</creationdate><topic>Construction</topic><topic>Construction companies</topic><topic>Construction industry</topic><topic>Decomposition</topic><topic>firm</topic><topic>Färe-Primont</topic><topic>Malaysia</topic><topic>meta-frontier</topic><topic>Productivity</topic><topic>total factor productivity</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Azman, Mohd Azrai</creatorcontrib><creatorcontrib>Hon, Carol K. H.</creatorcontrib><creatorcontrib>Skitmore, Martin</creatorcontrib><creatorcontrib>Lee, Boon Liat</creatorcontrib><creatorcontrib>Xia, Bo</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Construction management and economics</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Azman, Mohd Azrai</au><au>Hon, Carol K. H.</au><au>Skitmore, Martin</au><au>Lee, Boon Liat</au><au>Xia, Bo</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia</atitle><jtitle>Construction management and economics</jtitle><date>2019-02-01</date><risdate>2019</risdate><volume>37</volume><issue>2</issue><spage>72</spage><epage>88</epage><pages>72-88</pages><issn>0144-6193</issn><eissn>1466-433X</eissn><abstract>There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to date, by measuring the Total Factor Productivity (TFP) of 37 public-listed Malaysian construction firms over 14 years (2003-2016), based on the Färe-Primont index. In comparing different groups of building, civil and specialist construction firms, this is the first application of a meta-frontier framework to capture the technological gaps involved. Based on the construction firms' financial data, it is found that TFP improvement generally occurs due to Technical Efficiency (TE) and Scale-Mix Efficiency (SME) (largely scope economies), and significant technological gaps exist among different groups. Moreover, the industry suffered a decline in technologically related production environment over the period - prompting the conclusion that long-term policy engagement should focus on technological improvements. The paper provides a robust approach to analysing construction productivity at the firm level that also can be used for accessing productivity components and technological gaps in construction and other industries.</abstract><cop>London</cop><pub>Routledge</pub><doi>10.1080/01446193.2018.1506139</doi><tpages>17</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0144-6193
ispartof Construction management and economics, 2019-02, Vol.37 (2), p.72-88
issn 0144-6193
1466-433X
language eng
recordid cdi_crossref_primary_10_1080_01446193_2018_1506139
source EBSCO Business Source Complete
subjects Construction
Construction companies
Construction industry
Decomposition
firm
Färe-Primont
Malaysia
meta-frontier
Productivity
total factor productivity
title A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T16%3A17%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20Meta-frontier%20method%20of%20decomposing%20long-term%20construction%20productivity%20components%20and%20technological%20gaps%20at%20the%20firm%20level:%20evidence%20from%20Malaysia&rft.jtitle=Construction%20management%20and%20economics&rft.au=Azman,%20Mohd%20Azrai&rft.date=2019-02-01&rft.volume=37&rft.issue=2&rft.spage=72&rft.epage=88&rft.pages=72-88&rft.issn=0144-6193&rft.eissn=1466-433X&rft_id=info:doi/10.1080/01446193.2018.1506139&rft_dat=%3Cproquest_cross%3E2183665910%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2183665910&rft_id=info:pmid/&rfr_iscdi=true