A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia

There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Construction management and economics 2019-02, Vol.37 (2), p.72-88
Hauptverfasser: Azman, Mohd Azrai, Hon, Carol K. H., Skitmore, Martin, Lee, Boon Liat, Xia, Bo
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to date, by measuring the Total Factor Productivity (TFP) of 37 public-listed Malaysian construction firms over 14 years (2003-2016), based on the Färe-Primont index. In comparing different groups of building, civil and specialist construction firms, this is the first application of a meta-frontier framework to capture the technological gaps involved. Based on the construction firms' financial data, it is found that TFP improvement generally occurs due to Technical Efficiency (TE) and Scale-Mix Efficiency (SME) (largely scope economies), and significant technological gaps exist among different groups. Moreover, the industry suffered a decline in technologically related production environment over the period - prompting the conclusion that long-term policy engagement should focus on technological improvements. The paper provides a robust approach to analysing construction productivity at the firm level that also can be used for accessing productivity components and technological gaps in construction and other industries.
ISSN:0144-6193
1466-433X
DOI:10.1080/01446193.2018.1506139