Multi-threaded simulated annealing for a bi-objective maintenance scheduling problem

A parallel Simulated Annealing algorithm with multi-threaded architecture is proposed to solve a real bi-objective maintenance scheduling problem with conflicting objectives: the minimisation of the total equipment downtime caused by maintenance jobs and the minimisation of the multi-skilled workfor...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production research 2012-01, Vol.50 (1), p.63-80
Hauptverfasser: Safaei, Nima, Banjevic, Dragan, Jardine, Andrew K.S.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A parallel Simulated Annealing algorithm with multi-threaded architecture is proposed to solve a real bi-objective maintenance scheduling problem with conflicting objectives: the minimisation of the total equipment downtime caused by maintenance jobs and the minimisation of the multi-skilled workforce requirements over the given horizon. The maintenance jobs have different priorities with some precedence relations between different skills. The total weighted flow time is used as a scheduling criterion to measure the equipment availability. The multi-threaded architecture is used to speed up a multi-objective Simulated Annealing algorithm to solve the considered problem. Multi-threading is a form of parallelism based on shared memory architecture where multiple logical processing units, so-called threads, run concurrently and communicate via shared memory. The performance of the parallel method compared to the exact method is verified using a number of test problems. The obtained results imply the high efficiency and robustness of the proposed heuristic for both solution quality and computational effort.
ISSN:0020-7543
1366-588X
DOI:10.1080/00207543.2011.571444