Optimal opportunity-based age replacement policies in discrete time
This paper focuses on discrete-time opportunity-based age replacement models with replacement first and last disciplines, where the expected cost model under each discipline can be further classified into six cases by taking account of the priority of multiple replacement options. We characterize se...
Gespeichert in:
Veröffentlicht in: | Reliability engineering & system safety 2024-01, Vol.241, p.109587, Article 109587 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | This paper focuses on discrete-time opportunity-based age replacement models with replacement first and last disciplines, where the expected cost model under each discipline can be further classified into six cases by taking account of the priority of multiple replacement options. We characterize several optimal opportunity-based age replacement policies minimizing the relevant expected costs. Also, we relax assumptions on the deterministic priority and introduce the probabilistic priority to unify six discrete-time opportunity-based age replacement models with deterministic priorities under each discipline. In numerical illustrations, we give a case study to schedule the preventive replacement plan for pole air switches in a Japanese power company and compare all the optimal scheduled preventive replacement times with replacement first and last disciplines.
•Development of discrete-time opportunity-based age replacement models under replacement first and last disciplines.•Introduction of the priority for replacement options related with simultaneous events.•Characterization of the optimal preventive replacement times by minimizing the relevant expected cost per unit time. |
---|---|
ISSN: | 0951-8320 1879-0836 |
DOI: | 10.1016/j.ress.2023.109587 |