The Mu2e crystal and SiPM calorimeter

The calorimeter of the Mu2e experiment is being assembled, with all production components completed and tested, apart from the digital electronics that is still underway. The mechanical structure is fully built, with a complete integration and test of all the analog sensors and electronics. We summa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment Accelerators, spectrometers, detectors and associated equipment, 2024-12, Vol.1069, p.169959, Article 169959
Hauptverfasser: Atanov, N., Baranov, V., Bloise, C., Borrel, L., Ceravolo, S., Cervelli, F., Colao, F., Cordelli, G., Corradi, G., Davydov, Yu.I., Di Falco, S., Diociaiuti, E., Donati, S., Echenard, B., Fedeli, P., Ferrari, C., Gioiosa, A., Giovannella, S., Giusti, V., Glagolev, V., Hampai, D., Happacher, F., Hitlin, D.G., Martini, M., Middleton, S., Miscetti, S., Morescalchi, L., Paesani, D., Pasciuto, D., Pedreschi, E., Porter, F., Raffaelli, F., Saputi, A., Sarra, I., Spinella, F., Taffara, A., Zhu, R.Y.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The calorimeter of the Mu2e experiment is being assembled, with all production components completed and tested, apart from the digital electronics that is still underway. The mechanical structure is fully built, with a complete integration and test of all the analog sensors and electronics. We summarize construction and assembly phases, Quality Control tests, calibration procedures and first tests performed in the assembly area, as well as the installation and commissioning plans of the final disks in the Mu2e hall.
ISSN:0168-9002
DOI:10.1016/j.nima.2024.169959