Development of aerobic granulation system for simultaneous removal of C, N, and P in sequencing batch airlift reactor

Conventional biological nutrient removal techniques often have disadvantages like low removal efficiencies, requirement of large footprint, and excess sludge production. Ever increasing stringent discharge standards demand for alternative technologies. In this context aerobic granular sludge (AGS) h...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of environmental chemical engineering 2021-10, Vol.9 (5), p.106100, Article 106100
Hauptverfasser: Desireddy, Swathi, Sabumon, P.C.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Conventional biological nutrient removal techniques often have disadvantages like low removal efficiencies, requirement of large footprint, and excess sludge production. Ever increasing stringent discharge standards demand for alternative technologies. In this context aerobic granular sludge (AGS) has evolved as a promising technology for complete nutrient removal. However, degradation of structural integrity of aerobic granules in long run is a prime concern of this technology. This work attempts to develop stable aerobic granules in an automated sequential batch airlift reactor (SBAR) for simultaneous C, N, and P removals under alternating aerobic and anoxic conditions. The reactor was operated at high sludge retention time (SRT). Combined operating strategies of varying dissolved oxygen (DO) concentration and feed cycle times were followed to optimize the conditions for effective granulation and subsequent removal efficiencies. Profiles of extracellular polymeric substances (EPS) and sludge volume index (SVI) were monitored. Optimum removal efficiencies of NH4+-N (92.7%), TN (90.6%), COD (90.1%), and PO43--P (83.2%), and granules of size 1.3–8 mm were achieved in phase IV at operational DO of 1–2 mg/L, and feeding intervals of 15 h and 9 h. NH4+-N (R2 = 0.97, k = 0.5093/h) and PO43--P (R2 = 0.95, k = 0.2574/h) removals were fitted well with first order kinetic model and that of COD (R2 = 0.97, k = 0.0032 L/mg/h) followed second order kinetics. This process is economical as effective biological nutrient and organics removal occurs in a single reactor without requirement of alkalinity supply, and negligible excess sludge production. The process requires small foot print and applicable for decentralized wastewater management in University campuses/tourist resorts/apartment complexes. [Display omitted] •Stable aerobic granular sludge was developed for simultaneous CNP removal in a SBAR by optimizing DO and feed cycle intervals.•Aerobic granules of size 1.3–8 mm were achieved at operational DO of 1–2 mg/L.•Simultaneous removal of COD (90.1%), Total Nitrogen (90.6%), and PO43--P (83.2%) were achieved in phase IV.•Zero sludge discharge was achieved at optimal feed cycle involving a long starvation period.•Excellent granule stability and effective nutrient removal were attained even at a very high SRT of 124 days.
ISSN:2213-3437
2213-3437
DOI:10.1016/j.jece.2021.106100